Gas Stations

Gas Stations

Upgrade your gas station with EV charging to attract new customers, boost revenue, and lead your business in fuelling the future.

Industry solutions · Gas stations

EV charging for petrol pumps and fuel stations in India

Turn your forecourt into a stop for both fuel and electric. Teslavolts DC fast chargers from 60 to 240 kW add 100-plus km in a coffee break, bring EV drivers into your store and earn per kWh, on highways and in cities.

  • Works with every EV sold in India
  • Survey, installation and OCPP software
  • Proposal within one working day
Live plan · Highway fuel station
1 × Ad. Bright AC (2 × 11 kW) + 3 × DC Pro 60 kW 60 vehicles a day · 1,269 kWh a day · 215 kVA Change it for your site →

What EV charging does a fuel station site need?

Fuel stations need DC fast charging, because drivers stop for 20 to 45 minutes, not hours. A 60 kW charger suits city stations and cabs; highway stations need 120 kW or more, and truck stops 240 kW or more. India's 2024 guidelines plan a charging station every 20 km on both sides of highways, and oil companies have already installed over 27,000 chargers at their outlets.

Typical site
Highway fuel station
Suggested mix
1 × Ad. Bright AC (2 × 11 kW) + 3 × DC Pro 60 kW
Supply at full power
215 kVA
Charging revenue
₹8,34,104 a month
Connectors
CCS2 (DC) and Type 2 (AC): every EV sold in India

EV charging use cases for gas stations

Pick the situation closest to yours: the planner loads it with typical figures you can change.

  1. 01

    Highway fuel station

    Travellers stop for 30 to 45 minutes; 120 kW adds most of a day's driving while they eat.

    • 60 vehicles/day
    • Cars and SUVs
    • Mostly DC

    1 × Ad. Bright AC (2 × 11 kW) + 3 × DC Pro 60 kW

  2. 02

    City fuel station

    Cabs and city drivers top up in 30 minutes on 60 kW between rides.

    • 50 vehicles/day
    • Taxis and ride-hailing
    • Mostly DC

    1 × Ad. Bright AC (2 × 11 kW) + 4 × DC Pro 60 kW

  3. 03

    Truck stop and dhaba

    Electric trucks and buses charge on 240 kW during driver breaks.

    • 15 vehicles/day
    • Buses and trucks
    • Mostly DC

    2 × DC Pro 120 kW

  4. 04

    Forecourt with a store

    DC for quick stops plus screen chargers by the store for longer stays and advertising.

    • 40 vehicles/day
    • Cars and SUVs
    • Mostly DC

    1 × Ad. Bright AC (2 × 11 kW) + 2 × DC Pro 60 kW

Site planner for gas stations

Move the sliders. The planner picks chargers from the current Teslavolts range, sizes the supply and shows what the site earns or saves.

Start from a typical site
Vehicles
More settings: top-up time, energy, supply

Suggested charger mix

  • Ad Bright AC 1
    1 × Ad. Bright AC (2 × 11 kW)AC · 2 charging points for 3 vehicles parked 0.75 h
    Buy
  • DC 60 1
    3 × DC Pro 60 kWDC · 6 guns for 57 vehicles, about 24 min per top-up
    Quote
Energy per day
1,269 kWh
Supply at full power
215 kVA
Charging revenue per month
₹8,34,104
Fuel replaced per month
17,766 litres

At ₹14 a kWh on AC and ₹22 on DC; about ₹5,10,509 a month after electricity at ₹8.5 a kWh. 30 days.

  • Vehicles parked 0.75 h add about 5 kWh on AC. Raise the fast-charge share if they need more.
  • AC chargers: ₹3,28,545 online price incl. GST. DC chargers are quoted per site.
Get my site proposal

A first sizing from typical figures, not a quotation. We confirm the mix, supply and price after a site survey.

Recommended chargers for gas stations

From the current Teslavolts range, with live prices. AC chargers can be ordered online; DC chargers are quoted per site.

Why it fits City forecourts and cab stands: two guns, fits a modest supply upgrade.

Why it fits The highway workhorse: two cars at once with power sharing.

Why it fits Busy highway stations with mixed car and commercial traffic.

Why it fits Truck stops and bus corridors.

Why it fits Dual AC by the store with a 43″ screen that sells ads while cars charge.

Teslavolts Ad. Bright AC, product view

Dual-gun AC with 43″ ad screen

Ad. Bright AC

Dual charging with a 43″ outdoor media screen that earns while cars charge.

Power
2 × 11 / 2 × 22 kW
Connector
Type 2 / Type 1 / GB/T
Enclosure
IP55
  • BIS certified (IS 17017)

From ₹3,28,545 incl. GST

What to consider, and how ready your site is

Tick what you already have. Your readiness goes with your proposal request, so our engineers start where you are.

0 of 6 readySite readiness

Rules and numbers in India

Questions about EV charging for gas stations

Not answered here? Our team replies on WhatsApp.

Ask on WhatsApp

What size EV charger should a petrol pump install?

60 kW DC for city stations and cab traffic, 120 kW or more for highways, and 240 kW or more where trucks and buses stop. AC chargers only make sense by the store or restaurant where drivers stay longer.

How long do drivers stay at a fuel-station charger?

Typically 20 to 45 minutes. In 30 minutes a 120 kW charger adds up to about 50 kWh to a car that accepts that power, enough for 250 km or more in most cars.

Can EV chargers be installed near fuel dispensers?

Chargers must be outside the hazardous area around dispensers and tanks, as set by your oil company and PESO approvals. We plan the layout and cable route accordingly.

How does a fuel station earn from EV charging?

From the per-kWh charging price, from store and restaurant sales during the charge, and from advertising on screen chargers. The planner shows the monthly charging revenue for your traffic.

Turn your plan into a proposal

Your plan and readiness check are attached automatically. An engineer reviews them, calls you within one working day and sends a site proposal with chargers, supply, installation and price.

Your plan

1 × Ad. Bright AC (2 × 11 kW) + 3 × DC Pro 60 kW

  • Send your plan
  • Free site survey
  • Proposal and installation

Free, no obligation. Your details are used only for this request.

Tools & Resources

Charging Revenue Calculator

Rebate & Incentive Finder