Industries

Fleets

Your electric fleet needs the strongest possible infrastructure. With TeslaVolts, you’ll experience a flexible and personalized solution for EV charging for fleets that’s built to scale as you do.

Industry solutions · Fleets

EV fleet charging for cabs, delivery vans, buses and trucks

Cut fuel cost and keep every vehicle on the road. Teslavolts sizes depot charging to your shifts: overnight AC for vehicles that park, DC fast charging for quick turnarounds, and 240 kW-plus for buses and trucks, all on fleet software.

  • Works with every EV sold in India
  • Survey, installation and OCPP software
  • Proposal within one working day
Live plan · Cab and ride-hailing fleets
5 × Twins Pedestal (2 × 11 kW) + 2 × DC Pro 60 kW 40 vehicles a day · 1,000 kWh a day · 242 kVA Change it for your site →

What EV charging does a fleet depot site need?

Fleet depots should match charging to shift patterns: vehicles parked overnight charge on AC, vehicles that turn around within an hour need DC, and buses and trucks need high-power DC (India's 2024 guidelines ask for at least 240 kW at e-bus depots). Charging in solar hours, when EV tariffs are lower, cuts the energy bill further.

Typical site
Cab and ride-hailing fleets
Suggested mix
5 × Twins Pedestal (2 × 11 kW) + 2 × DC Pro 60 kW
Supply at full power
242 kVA
Fuel savings
₹9,32,500 a month
Connectors
CCS2 (DC) and Type 2 (AC): every EV sold in India

EV charging use cases for fleets

Pick the situation closest to yours: the planner loads it with typical figures you can change.

  1. 01

    Cab and ride-hailing fleets

    Overnight AC at the depot for cars that park, DC top-ups between shifts for cars that run double shifts.

    • 40 vehicles/day
    • Taxis and ride-hailing
    • Mostly DC

    5 × Twins Pedestal (2 × 11 kW) + 2 × DC Pro 60 kW

  2. 02

    Last-mile delivery vans

    Electric vans return in the evening and charge overnight; one DC charger handles urgent turnarounds.

    • 30 vehicles/day
    • Vans and light trucks
    • Mostly AC

    8 × Twins Pedestal (2 × 11 kW) + 1 × DC Pro 60 kW

  3. 03

    Electric bus depots

    High-power DC between and after shifts. The 2024 guidelines ask for at least 240 kW at e-bus depots.

    • 20 vehicles/day
    • Buses and trucks
    • Mostly DC

    3 × DC Pro 120 kW

  4. 04

    Trucks and logistics hubs

    Heavy vehicles charge on 240 to 400 kW DC during loading and driver breaks.

    • 12 vehicles/day
    • Buses and trucks
    • Mostly DC

    2 × DC Pro 120 kW

  5. 05

    Corporate pool and staff cars

    Office parking charges pool cars and employees' EVs during the working day.

    • 15 vehicles/day
    • Cars and SUVs
    • Mostly AC

    7 × Twins Pedestal (2 × 11 kW) + 1 × DC Pro 60 kW

Site planner for fleets

Move the sliders. The planner picks chargers from the current Teslavolts range, sizes the supply and shows what the site earns or saves.

Start from a typical site
Vehicles
More settings: top-up time, energy, supply

Suggested charger mix

  • Twins Pedestal 1
    5 × Twins Pedestal (2 × 11 kW)AC · 10 charging points for 20 vehicles parked 8 h
    Buy
  • DC 60 1
    2 × DC Pro 60 kWDC · 4 guns for 20 vehicles, about 33 min per top-up
    Quote
Energy per day
1,000 kWh
Supply at full power
242 kVA
Fuel savings per month
₹9,32,500
Fuel replaced per month
12,500 litres

Fuel at ₹95 a litre against electricity at ₹8.5 a kWh, 30 days.

  • AC chargers: ₹8,19,000 online price incl. GST. DC chargers are quoted per site.
Get my site proposal

A first sizing from typical figures, not a quotation. We confirm the mix, supply and price after a site survey.

Recommended chargers for fleets

From the current Teslavolts range, with live prices. AC chargers can be ordered online; DC chargers are quoted per site.

Why it fits Two vehicles per pedestal for overnight depot charging, with load balancing and a metered output per gun.

Why it fits Fast turnarounds for cabs and vans between shifts.

Why it fits Double-shift cab fleets and mixed depots.

Why it fits E-bus and e-truck depots: meets the 240 kW depot requirement in one charger.

Why it fits Megawatt-scale bus and truck depots and 800 V vehicles.

What to consider, and how ready your site is

Tick what you already have. Your readiness goes with your proposal request, so our engineers start where you are.

0 of 6 readySite readiness

Rules and numbers in India

Questions about EV charging for fleets

Not answered here? Our team replies on WhatsApp.

Ask on WhatsApp

How many chargers does an EV fleet depot need?

It depends on how many vehicles return at once, how long they park and how far they drive. Overnight fleets often need one AC charging point per vehicle; fleets that turn around within an hour need DC. Enter your fleet in the planner on this page for a first sizing.

How much can a fleet save by switching to electric?

The planner compares the cost of electricity with petrol or diesel for your daily energy. With the default assumptions a cab running on electricity costs a fraction per kilometre of a diesel cab; change the prices to your own.

What charging power do electric buses need?

Bus depots typically use 120 to 240 kW DC chargers per bay, and India's 2024 guidelines ask for at least 240 kW of charging at e-bus depots. Teslavolts DC Pro 240 and DC Premier Plus chargers cover this.

Can we track charging cost per vehicle and driver?

Yes. Networked chargers connect over OCPP to fleet charging software with driver RFID cards, per-vehicle energy and cost reports.

Turn your plan into a proposal

Your plan and readiness check are attached automatically. An engineer reviews them, calls you within one working day and sends a site proposal with chargers, supply, installation and price.

Your plan

5 × Twins Pedestal (2 × 11 kW) + 2 × DC Pro 60 kW

  • Send your plan
  • Free site survey
  • Proposal and installation

Free, no obligation. Your details are used only for this request.

Tools & Resources

Charging Revenue Calculator

Rebate & Incentive Finder